Advanced

Re: All D on day 1-28

[Resolved] All D on day 1-28
April 24, 2022 04:19PM
This is two requests in one (super similar). The only difference is that the first is for Difficulty and the second is for Terrain.

GC-Code: GC9R12W
Quote

The requirement is to have logged every unique difficulty rating (1.0, 1.5, 2.0 ... 5.0) on day 1-28 for each month.

In other words, you have to log a find for each difficulty rating on the 1st, 2nd, 3rd ... 28st. It's not required that these finds are in the same month or even the same year. Day 29-31 in the months that has them can be ignored. The minimum amount of finds to complete this challenge is therefore 252 (9*28).


GC-Code: GC9R12Z
Quote

The requirement is to have logged every unique terrain rating (1.0, 1.5, 2.0 ... 5.0) on day 1-28 for each month.

In other words, you have to log a find for each terrain rating on the 1st, 2nd, 3rd ... 28st. It's not required that these finds are in the same month or even the same year. Day 29-31 in the months that has them can be ignored. The minimum amount of finds to complete this challenge is therefore 252 (9*38).


Initally I had them at all days (1-31) but got denied by HQ. Doing it on 1-28 has been approved, but I didn't find a good way to make a challenge checker for it myself.
Re: All D on day 1-28
April 24, 2022 08:40PM
Here are the link
GC-Code: GC9R12W https://project-gc.com/Challenges/GC9R12W/68215
GC-Code: GC9R12Z https://project-gc.com/Challenges/GC9R12Z/68216

I first made it a combined checker but if you do not fulfill the missind dates are very difficult to find

Please test and reply
Re: All D on day 1-28
April 25, 2022 09:12AM
Thanks, looks great! I have added them to my cache descriptions and resubmitted.