Change History
Once a checker request has been fulfilled and the challenge owner (or checker requester) is satisfied the thread should be moved here by a moderator. Please allow some time before moving the thread, to allow feedback from the requester.
Changed By: jpavlik
Change Date: November 30, 2016 10:20AM
Re: GC51WYB - 1 full month with non-traditional caches, 5 types
In the fist request you have wrote and in the original listing is:
> Those consecutive days must have the 1st date of a calendar month and the 28th dat of the same calendar month in that order.
So, not day 30, but day 28 must be included, so November 30th - December 29th should be ok.
I've checked the listing too, it's 28. So I don't understand the last sentence with "but c'mom".
I thing that it's ok, however try to I've ask the owner., I'm waiting to his reply.
Original Message
Author: jpavlik
Date: November 30, 2016 08:04AM
Re: GC51WYB - 1 full month with non-traditional caches, 5 types
In the fist request you have wrote and in the original listing is:
> Those consecutive days must have the 1st date of a calendar month and the 28th dat of the same calendar month in that order.
So, not day 30, but day 28 must be included, so November 30th - December 29th should be ok.
I've checked the listing too, it's 28. So I don't understand the last sentence with "but c'mom".
I thing that it's ok, however try to ask the owner.